What Steps Are Involved In Installing Colorbond Fencing and Gates?
Installing Colorbond fencing will
initially look like a simple procedure, but in the absence of the right tools, skills
and instructions, this could soon become a nightmare for any homeowner. Hence,
hiring an installation professional with expertise in installing Colorbond
fencing and other types is recommended. The best feature of these installation
professionals is that they have adequate tools and follow a step-by-step
process that results in a perfect installation. Let us understand the procedure
they follow to install these fences. But first, we will review the materials
they use for installation.
What You Will Need To Install a Colorbond Fence?
- Rubber Mallet
- Tape Measure
- Spirit Level
- Safety Equipment (Ear Muffs and Goggles)
- Trade Saw Horse
- Grip Bar Clamp
- Tin Snips
- Angle Grinder
- Drill
- Shovel
- String
- Hose
Steps To Install Colorbond Fencing and Colorbond Fence Extensions
Step 1
Removing Old Fence
The process begins with removing
the old fence, and while doing this, the professionals also check for factors
like tree roots, pipes, slopes, length and height. This quick inspection
ensures the precise level of the upcoming Colorbond fencing.
Step 2
Digging The Holes
The second step to install
Colorbond fencing will include digging holes at roughly 600 mm deep and 200 mm
wide.
Step 3
Installing The Bottom Rail
The fence experts will then install the
bottom rail by connecting it with the first two posts and ensuring the correct
level. These professionals use a drill to put a spring through the post to
secure the bottom rail. Once the bottom rail is secured, these professionals
dig the next end hole and drop the next post.
Step 4
Filling The Concrete
Professionals involved in
installing Colorbond fencing and Colorbond gates will use concrete to half-fill
each end hole to make it sturdy and secure. This concrete is filled to ensure
that everything is robust as they put in the panels.
Step 5
Installing The First Panel
The professionals install the
first panel by inserting the bottom near the end post and pushing it down into
the bottom rail. They ensure that only one panel is installed at a time.
Step 6
Inserting The Top Rail
Experts continue inserting the
panels, and finally, it's time to insert the top rail into the first panel.
They have to push it between the posts and secure it with the first panel. They
keep the last corrugation free to ensure that the next panel is attached easily.
Step 7
Inserting The Panels
Inserting the panels involves
repeating the process of inserting the bottom end of the panel into the bottom
rail first. They then slide into the top rail while ensuring that the first
corrugation overlaps with the last panel corrugation. They must move the panels
into the bottom hole and secure it by pushing down the top rail.
Step 8
Fastening The Top Rail
Fastening the top rail involves
pushing them down and connecting them by drilling screws through the post. This
drilling is done on both ends of the panel, but before this, it is ensured that
the top rail is levelled completely.
This process continues with
installing all the infill panels on the top and bottom rails. It will continue
until the bigger sections are installed.
Step 9
Infilling The Panels
In this step, the professionals
will cut an infill panel to fit in the things precisely. The team measures the
space between two posts and marks the distance at the top and bottom. They will
then use a spirit level to draw a line in between. In this situation, they will
also use an angle grinder to cut along the lines, but only after wearing all
the safety gear, safety glasses, gloves, etc.
Step 10
Cutting The Rails For Infill Panels
Experts of colorbond fencing
installation will use the same measurement to cut top and bottom rails. They
will use an angle grinder again to match the holes and infill panels at the
right length of Colorbond fence extensions.
Step 11
Installing The Last Panel
Installing the last panel of
Colorbond fencing is easy as they will place the bottom rail between the posts
and secure it through the familiar process of using a spirit level and then
drilling them. While doing this, they ensure that the top rail and the bottom
rail is treated the same way and the level is checked before securing them with
screws.