profile-bg
avatar

GBS
2

, Last online: 1 month ago

Contact Info

  • City:
    WINNIPEG
Garage Package - built in 10 hoursThe only garage package "Built in
Ten Hours".Fully insulated
with 6" thick Type 2 EPS rigid insulation with R-40.Completely
"ENER-GREEN" building materials.Thermal
envelop building system that can be heated with solar energy only.Comes
with gauge 29 colored metal roof sheathing and all fascia, eaves, and
flashing included.Exterior wall
finish with nylon mesh, scratch coat and acrylic stucco.PVC
window, low E, double pane and argon gas.Insulated

Experience

  • Joined APSense.com
    Mar 2010
Testimonials
View All