What Is Standby Generator Set - Emergency Diesel Generator
Standby diesel generator
set: In the normal case, the power required by the user is supplied by the
mains, and when the mains is cut off or the power is interrupted for other
reasons, the generator set is set up to ensure the basic production and life of
the user. Such generator sets are mainly located in telecommunications
departments, hospitals, industrial and mining enterprises with tight supply of
electricity, airports and TV stations. This kind of unit maintains the standby
state at any time, can provide the continuous power supply to the non-constant
load.
These standby generator
sets only start power generation when the power system fails and both power
supplies are powered off at the same time.
Setting
principle
(1) When the civil
building needs to be powered by the primary load requirement, if the urban
power grid can provide two independent power sources (one for use and one for
standby or mutual standby), the diesel generator set may not be provided. But
when there is a particularly important load in the primary load, a diesel
generator set should generally be provided as an emergency power power.
(2) When the power grid
can only provide one power supply, in order to meet the power supply
requirements for the first and second stage loads, a diesel generator set
should be generally set up. At this time, the genset will be used as a backup
power source and an emergency power source.
(3) In large and
medium-sized commercial buildings, diesel generator sets should be installed to
ensure that there is no major economic loss when the mains supply is
interrupted. Because the urban power grid cannot be completely independent,
sometimes another power supply may fail at the same time when one power supply
fails or is overhauled. Therefore, even if there are two or more power supply,
in order to ensure reliable power supply for fire protection and other
important equipment (such as intelligent equipment, communication equipment,
etc.) in civil buildings, diesel generator sets are generally installed.
Generator
set selection
(1) The choice of the
number of units. When the capacity of the generator set is selected by the
motor starting capacity, the number of generators cannot be many, because the number
of units increases, and the capacity of the single unit is small, which may
fail to meet the starting requirements of the motor. Generally, when the
capacity does not exceed 800 kW, it is better to use a single machine. When the
capacity is above 800 kW, 2 units should be selected, and the physical
parameters of the two units should be the same, which is convenient for the
unit to run in parallel.
(2) The choice of other
features. The civil construction standby emergency generator set should use high-speed
diesel generator set and brushless automatic excitation device. The selected
unit should be equipped with fast automatic starting and automatic power
switching device, and should have the function of self-starting for 3
consecutive times. It is not suitable to start with compressed air. Generally,
24V battery pack is used as the starting power source.
Generator
room setting
1. Plane layout of the
machine room
When selecting the plane
position of the machine room, it should be adjacent to the power distribution
room as much as possible, because it is convenient for wiring, reducing the
loss of materials and electric energy, and also convenient for management. If
conditions permit, the machine room should be located on the first floor, which
is convenient for ventilation, heat dissipation and smoke exhaustion. However,
in high-rise buildings and large and medium-sized commercial buildings, the
first floor is usually used as a commercial room, and the owners generally do
not agree with this plan, so the machine room is often located in the basement.
At this time, the following points should be noted in selecting the location of
the equipment room:
(1) The machine room
should have one side against the outer wall, so that the equipment ventilation,
smoke exhaust is easier to deal with;
(2) It should be noted
that the lifting, handling and maintenance of the unit is convenient.
Generally, the parking garage access channel is used as the handling channel.
However, if the passage is too small, the position of the lifting hole should
be considered;
(3) Should avoid the
damp place, do not set it under the regular water supply place such as the
toilet, bathroom, pool, etc. or next door, to avoid toilet maintenance or floor
seepage affecting the operation of the unit.
2.
Ventilation and heat dissipation of the unit
Diesel engine, generator
and exhaust pipe dissipate heat during operation, which increases the
temperature of the machine room. If the temperature rises to a certain extent,
it will affect the output of the generator. Therefore, measures must be taken
to ensure the cooling of the unit. In the case of sufficient air intake and
exhaust ventilation, the closed-type water circulation and air-cooled integral
unit is generally used. Otherwise, the exhaust fan and the heat-dissipating
pipe can be separated from the unit, and placed outdoor, and the outdoor heat
dissipation pipe is connected with the diesel engine by a water pipe.
3.
Smoke exhaust
When designing the smoke
exhaust pipe system, the following points should be noted:
(1) The smoke exhaust
system can reduce the back pressure as much as possible, because the increase
of exhaust gas resistance will lead to the decrease of diesel engine output and
the increase of temperature rise. Therefore, the shorter and straighter the
exhaust pipe, the better.
(2) The exhaust pipe
should be insulated to reduce scald and reduce thermal radiation to raise the
temperature of the machine room.
(3) A muffler should be
provided to reduce noise.
4.
Noise processing
The selected units in
general civil buildings are high-speed units. The noise is relatively large. In
order to meet the requirements of environmental protection, the damping
material should be set in the equipment room and the noise reduction measures
should be taken. Since the actual situation of each project is very different,
when selecting an emergency diesel generator set, in addition to meeting the
standard requirement, it should be set according to the actual situation to
achieve satisfactory results.