SimFWD: Feasibility Studies for Ballast Water Treatment System (BWTS) & Exhaust Gas Cleaning System

Posted by Sim Fwd
2
Jul 11, 2018
585 Views
As per IMO guidelines, on-board Ballast Water Treatment(BWT) systems will soon need to be installed on most ships. There are several manufacturers of BWT systems offering different treatment systems – UV systems, chemical injection systems & electrolytic system. There are several factors which need to be considered to choose a system which is best suited to a particular vessel.

Additionally, ship owners will also be needed to make the decision to either install exhaust gas scrubbers or to switch to low-sulphur marine fuel oil.

Our scope of services for BWT & Scrubber Retrofit Projects includes:

EVALUATION & SELECTION OF SYSTEM / TECHNO-ECONOMICAL ANALYSES

• Support and general guidance for understanding BWTS & Scrubber technology
• Assistance on evaluation of System quotations
• CAPEX, OPEX Calculations
• Comparative Charts and reporting

SURVEY & 3D LASER SCANNING


• Onboard visit for visual survey and 3D Laser Scanning of possible installation spaces
• Compilation of possible installation scenarios
• Examination of available resources (i.e. space, power, pressure head)
• Detailed Reporting

BASIC ENGINEERING – FEASIBILITY STUDY

• Main System components + main piping + service spaces are modeled inside the point cloud
• Virtual installation scenarios
• Feasibility of installation

FINAL INSTALLATION DRAWINGS & PRE-FABRICATION

• Final installation scenario
• Drawings for Classification Approval
• Installation drawings (for pre-fabrication)

Ballast Water Treatment Engineering

For more Information on our Ballast Water Treatment & Scrubber Retrofit Engineering Services, please visit http://www.simfwd.com/01-bwt-scrubber

Get More Info About- R&D Engineering
Comments
avatar
Please sign in to add comment.