Oakville's Lakeshore Road to be overhauled over 2021
Oakville's Town Council took significant steps forward on Monday night’s Planning and Development meeting with three major road construction projects in the downtown area: the Lakeshore Road reconstruction and streetscape project from Allan Street to Navy Street; the rehabilitation of Lakeshore Bridge at Sixteen Mile Creek; and the conversion of a two-way street system in the downtown area.
These projects as well as funding for market testing for the Downtown Culture Hub project and interim improvements to the Oakville Centre for the Performing Arts have been referred to the 2016 Budget Committee for consideration in the 10-year Capital Forecast.
The proposed timing of the road projects are as follows:
- The two-year Lakeshore Road reconstruction and streetscape project from Allan Street to Navy Street to commence in 2019.
- The Lakeshore Bridge at Sixteen Mile Creek rehabilitation project to take place in advance of the road project as recent inspections of the bridge’s interior components have revealed its condition warrants attention sooner. Staff have been directed to report back to Council in early 2016 with details on the roll-out of the bridgework.
- The conversion of a two-way street system in the downtown area to begin sometime in 2016 or 2017
The timing of these road projects reflects the results from a survey conducted by the Downtown BIA of its members which indicated a strong preference for road reconstruction to begin in 2019.
The interim improvements to the Oakville Centre for the Performing Arts will ensure it remains in a state of good repair and will include modifications to improve the functionality and accessibility of the lobby. The market testing for the Downtown Culture Hub project aims to understand the potential for public-private sector partnerships.
Related Links: Shen Walji
Comments