BIM for Design, Construction and Asset Management in Railways
BIM engineers are automating design-build processes for a variety of industries, including education, healthcare, sports, residential, commercial, industrial, and infrastructure, using precise data. Building Information Modeling forms the cornerstone of the AEC industry's digital transformation in several facades like building design, floor plans, house blueprints, airport infrastructure, industrial plant design and process layout. And, railway is not an exception in this regard.
What is BIM in Railway?
A combination of collaborative modeling and data-sharing techniques for electronic models make up BIM in the railway industry. The system enables the secured management of data pertaining to the assets of Network Rail. Additionally, BIM adds value over the course of a project.
Benefits of Building Information Modeling for railway projects:
• Collaboration
• Time savings
• Cost Optimization
• Network conflict avoidance
• Facility management & optimization
• Improved work quality
• Prefabrication
Uses of Building Information Modeling in Railway:
• Producing drawings and documentation
• Interference management
• Analysis & simulation
• Quantity take-off
• Code Adherence
• Visualization
• Tendering
• Procurement
Take a look at: How Building Information Modeling Facilitated Water Treatment Plant in USA?
Railway Project Information Federation Strategy:
• Information Containers as per disciplines
• Geo-coordination & Geo-referencing
• Collaboration and sharing in secured way
How BIM Helps Railway Technology Solution?
• Railway Operation
• Asset Monitoring & Sensoring
• Maintenance & Asset Management
• Construction Layout & Machine Control
• Project Management
• Compliance & Assurance
• Engineering & Modeling
• Survey Solution
• External Data Sources
• Data Integration & Interoperability
• Visualization & Presentation
BIM Implementation Process in Railway:
• Identifying Priorities - Project Challenges
• Categorizing BIM Uses - Set Building Information Modeling Goals
• Building Awareness - Set Common Language
• Defining Information requirements
• Creating contractual documentation – EIR Manuals Guidelines Protocol
• Establishing Information Management Team Collaboration – Platform Setup Rail Information Exchange & Future proof technology stack
• Capability Assessment – Internal & external resources
• Executing & Monitoring Implementation - Focusing on integrated workflow
• Mandating BIM Information usage for decision making
• Determining Maturity and Improving
To know more about BIM for railways, or any other BIM infrastructure planning for AEC projects, contact Tejjy BIM Company in USA.